Tieling City is a dry town, with urban development, water demand is also increasing, the recycling of sewage significant. Construction of wastewater reuse project, to save water resources and reduce environmental pollution problems. Tieling City Wastewater Treatment Plant water reuse project to be dealt with the original two on the basis of a new 80,000 m3 / d of Chinese water treatment plants. Chinese water treatment plant project to be implemented in two phases, with a scale of processing 50,000 m3 / d, 2 scalable to 30,000 m3 / d. The design only requires design of the water treatment plant water purification process (1) not including transmission and distribution of water works and sewage treatment plant and ancillary buildings. The design of the main sewage treatment process is as follows : two water-submerged biofilter-tube static mixer-folded plate flocculation tank-tube settler-fast ordinary filter-source Toxicity pool through the above process can be further processed to remove two water suspended solids (SS), Dissolved organic matter (BOD5), the chemical oxygen demand (EM), nitrogen, phosphorus and other pollutants, to achieve water quality standards
中水回用工程:Water Reuse Project
折板絮凝池:Folded plate flocculation tank
斜管沉淀池:Tube settler
普通快滤池"Express ordinary filter
中水回用工程:Water Reuse Project
折板絮凝池:Folded plate flocculation tank
斜管沉淀池:Tube settler
普通快滤池"Express ordinary filter
我要举报
如以上问答内容为低俗、色情、不良、暴力、侵权、涉及违法等信息,可以点下面链接进行举报!
大家都在看
推荐资讯